GRR-Lamb 
carbonfiber layup over the foam
carbonfiber layup over the foam *
Viewed: 142 times.

now to finish the inside
now to finish the inside
Viewed: 126 times.

epoxy resin w/microballons, & 2
epoxy resin w/microballons, & 2" glass cloth *
Viewed: 127 times.

about the 2nd cut, slowly lowering to fit
about the 2nd cut, slowly lowering to fit *
Viewed: 140 times.

making sure canopy is centered, baffeling 100% done
making sure canopy is centered, baffeling 100% done
Viewed: 139 times.

after numerous cuts, split the canopy for winsheild, & drilled & cleco'd aft section to frame
after numerous cuts, split the canopy for winsheild, & drilled & cleco'd aft section to frame
Viewed: 122 times.

87 clecos' holding it together
87 clecos' holding it together
Viewed: 132 times.

now to fit & glass the fairing around lower edge of frame
now to fit & glass the fairing around lower edge of frame *
Viewed: 171 times.

everythings, wired & works. engine is done!
everythings, wired & works. engine is done! *
Viewed: 192 times.

* Comments available for this item.
Powered by Gallery v1 RSS